Booking the set has been tricky, mainly because it has been block booked for CPR students, so we have to work around their schedule. Its looking like the only time that we will have available to use it is 17th-26th Feb. After this the CPR students will be using it and rearranging and re decorating the flats. This in turn means that we won't be able to do any reshoots as our set will no longer exist..
I'm not too worried because I know that we will be able to get things done, but this does had pressure and means that when on set I have to make sure that each shoot runs like clock work. It also means that when scheduling, I need to account for time to do pick ups as I want to finish the shoot with more footage than we need. Doing so would mean that we can avoid being in a situation where we need to do a reshoot.
Another concern I have is actually building the set. I'm going to speak with Joeley about how long she thinks it will take to do, as we need to be able to build it and dress it before we shoot, and I think that this could be really time consuming .
No comments:
Post a Comment